46624, South Bend, Indiana - May 13, 2021
Concrete Slab Leveling or Mudjacking$4.15 - $5.09 per square foot (of slab being raised) Cost includes labor. Includes lifting the height of a sunken concrete slab to its original position. Does not account for concrete resurfacing, polishing, or sealing.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - December 17, 2019
Brick or Concrete Paver Installation$8.56 - $10.96 per square foot (concrete pavers) Quote estimate includes labor. Also includes site preparation, materials, laying pavers in a basic pattern, and finishing the newly paved surface. Cost does not account for removal or haul away of existing paved surface, elaborate or intricate paving patterns, and job sites with difficult soil conditions.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - September 27, 2019
Asphalt Paving Installation$2.39 - $3.72 per square foot Cost estimate takes into account the price of asphalt paving installation. Price includes basic site cleanup, ground leveling, and materials. Excludes tree clearing, sealcoating, and permitting.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - August 3, 2018
Stone Paving Installation$9.57 - $10.38 per square foot installed (flagstone) Cost includes labor. Includes compacted gravel base, flagstone pavers (dry-set), and sand for stone patio or walkway. Does not account for demolition of existing paving, mortared installations, concrete pad installation, and difficult site conditions.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - July 30, 2018
Concrete Driveway Installation$3.22 - $6.43 per square foot Cost estimate includes concrete driveway paving. Price does include materials, grading, and cleanup. Items excluded: staining, coloring, stamping, permitting and landscaping.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - July 17, 2018
Loose Gravel or Stone Paving$1.12 - $1.49 per square foot (4 inch thick gravel or crushed stone) Cost takes into account labor. Also includes delivery of gravel. Price does not include excavation or tree removal.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - July 5, 2018
Concrete Delivery$90.29 - $101.09 per cubic yard (3,000 psi 3/4" crushed stone) Labor is included in this concrete delivery cost. Does include delivery of concrete material (3,000 psi, 3/4" stone). Estimate does not include long-distance deliveries or reinforcing materials.
Reported by: ProMatcher Research Team |
46624, South Bend, Indiana - June 26, 2018
Asphalt Sealing$0.20 - $0.40 per square foot - residential (driveways) Includes labor. Cost estimate also includes sealer and cleanup. Excludes oil stain cleanup and crack repair.